National Repository of Grey Literature 12 records found  1 - 10next  jump to record: Search took 0.02 seconds. 
Reconstruction of road III/4348 Troubky - Vlkoš
Dočkal, Pavel ; Apeltauer, Jiří (referee) ; Holcner, Petr (advisor)
This bachelor thesis deals with the reconstruction of road III/4348 Troubky – Vlkoš. The reason for reconstruction is to repair directional and vertical course of the road. The road will be safer in this part. Original parameters were determined and then 2 options of solution the reconstruction were designed.
Straightening the road II/432 in the area Roštín – Těšánky
Škrabal, Jiří ; Krčmová, Iva (referee) ; Kosňovský, Michal (advisor)
The thesis is focused on the design of straightening of the road section between Roštín and Tesánky. The reason for the study is unsatisfactory layout of the current road and the goal is an increase of ride fluency and safety. Four direction and height solution were designed of which two were chosen for further solution.
Bypass Pelhřimov west
Dočkal, Pavel ; Hrazdira, Oldřich (referee) ; Holcner, Petr (advisor)
Final thesis deals with relocation of road I/34, specifically bypass Pelhřimov west. The crossing with roads I/19 and I/112 is solved by interchange roundabout in nothern part of bypass. Reason of construction is unification road I/34, which is a part of the international route E551, to category S11,5/70. The principal tasks was to keep it in the land use plan and the effort to maximize the alignment of volumes of earthworks.
Bypass of Želechovice nad Dřevnicí and Lípa
Škrabal, Jiří ; Nečas, Rudolf (referee) ; Kosňovský, Michal (advisor)
The thesis is focused on the design of the northern bypass of the villages Želechovice nad Dřevnicí and Lipa. The reason for the study is excessive traffic intensity and with that associated noise intensity. The objective of study is drop of traffic in villages and faster and smoother passage of transit traffic continued toward the road I/49. Seven direction solutions were designed of which one was chosen for further solution. This solution was designed in two variants.
The study interchanges R46
Dostál, Jan ; Janeček, Kamil (referee) ; Kosňovský, Michal (advisor)
The master´s thesis focuses on design interchange on R46 highway. The purpose of this thesis is to design optimal solution of transport capacity and safety. The another part of the thesis is solution of connecting on roads II/433 and III/37766. This solution is part of bypass plan, by city plan of Prostějov.
Location Study of The Road II/152 in Stage Modřice - Ivančice
Konečná, Tereza ; Čepil, Jiří (referee) ; Radimský, Michal (advisor)
The Diploma thesis is devoted to working out the searching study for modernization of the road II/152 between the cities Modřice and Ivančice with connection of the existing infrastructure to the new transport solution. The aim was the improvement of the quality of transport, reduce the traffic in the municipalities and the noice related to it and the improvement of environment.Four variants were designed and the most suitable possibility was solved
Straightening the road II/432 in the area Roštín – Těšánky
Škrabal, Jiří ; Krčmová, Iva (referee) ; Kosňovský, Michal (advisor)
The thesis is focused on the design of straightening of the road section between Roštín and Tesánky. The reason for the study is unsatisfactory layout of the current road and the goal is an increase of ride fluency and safety. Four direction and height solution were designed of which two were chosen for further solution.
The study interchanges R46
Dostál, Jan ; Janeček, Kamil (referee) ; Kosňovský, Michal (advisor)
The master´s thesis focuses on design interchange on R46 highway. The purpose of this thesis is to design optimal solution of transport capacity and safety. The another part of the thesis is solution of connecting on roads II/433 and III/37766. This solution is part of bypass plan, by city plan of Prostějov.
Bypass Pelhřimov west
Dočkal, Pavel ; Hrazdira, Oldřich (referee) ; Holcner, Petr (advisor)
Final thesis deals with relocation of road I/34, specifically bypass Pelhřimov west. The crossing with roads I/19 and I/112 is solved by interchange roundabout in nothern part of bypass. Reason of construction is unification road I/34, which is a part of the international route E551, to category S11,5/70. The principal tasks was to keep it in the land use plan and the effort to maximize the alignment of volumes of earthworks.
Location Study of The Road II/152 in Stage Modřice - Ivančice
Konečná, Tereza ; Čepil, Jiří (referee) ; Radimský, Michal (advisor)
The Diploma thesis is devoted to working out the searching study for modernization of the road II/152 between the cities Modřice and Ivančice with connection of the existing infrastructure to the new transport solution. The aim was the improvement of the quality of transport, reduce the traffic in the municipalities and the noice related to it and the improvement of environment.Four variants were designed and the most suitable possibility was solved

National Repository of Grey Literature : 12 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.